This weekend saw both 37714 and D6700 receive a levels check and a good inspection of all systems, this included the main and aux generator brushes on 6700, no issues were reported with either of the locos
37605 still awaits its date with the crane and everything is ready to lift
Once 37714 has completed its Santa turns it will be stopped for a C exam and the final pre heater fitting
6700 will receive a B exam
Kommentare