Winter Maintenance

The winter maintenance is well underway with the B exam completed. This has thrown up a little unexpected work in the shape of a leaking A bank water pump which will need to be replaced. This will be done when we fit the pre-heater pipework in the next few weeks. The pump will then be overhauled and placed in the spares pool.

37714 is due to be on display at Leicester N during the last weekend in March 26th/27th, if your at the railway come and have a look at the loco