Weekend Update!
- heavytractorgroup
- Feb 11
- 1 min read
Weekend Update
D6700 has been the main focus this weekend, still undercover at Swithland, her B exam was successfully started. A lot of progress was made, such as the checking over of electrical components, oil and coolant level checks, lighting checks and so on. So far all good!
Regarding 37714, she remains up at Loughborough with the rest of the diesel fleet. We are hoping to start putting her back together now the overhauled oil cooler and water pump are back at base this coming weekend. As well as this, the old oil will be drained out and replaced with newer oil. A few lengths of pipe work have also been cleaned up in the process of removing the cooler and pump. Once back together, we can give her a run up again to test everything out.
That’s all for this week. We thank you all for your support. Have a good week!
Heavy tractor group.